CHUTE COVER, ROLLER AND/OR SCRAPER WIRE INSTALLATION

 

 

 

                         

                                                                                                       

 

For chute cover installation:  Remove bottom floor by removing 6 small screws.  Remove small shaker wire from underneath distribution slide.  Move slide out of the way.  Slip chute cover over chute opening by slipping slotted edges of chute cover into frame of housing chute opening, pushing evenly until it stops.  Move slide back into place next to roller.  Re-install shaker wire underneath slide by slipping looped end into small hole in center bulkhead first and flexing it to slip other end into small hole located inside outer housing wall.  Re-install bottom floor while holding housing upside-down and install 6 small retaining screws—do not over-tighten.

 

For scraper wire installation:  Remove bottom floor by removing 6 small screws. Remove large white plastic gear from inside roller.  Lift up center bulkhead about a half inch.  Slip one end of scraper wire into small hole located inside the outer wall of housing.  While flexing other end next to center bulkhead, slip it into small hole in center bulkhead.  Push bulkhead down in place and push on side of bulkhead to make sure wire is firmly in place.  Re-install large plastic gear into roller by slowly spinning and pushing on gear until all the way in.  Move slide back into place next to roller.  Re-install shaker wire underneath slide by slipping looped end into small hole in center bulkhead first and flexing it to slip other end into small hole located inside outer housing wall.  Re-install bottom floor while holding housing upside-down and install 6 small retaining screws—do not over-tighten.

 

For roller installation, you will follow the same procedure as the scraper wire installation, except that you will install the roller at the same time as you do the scraper wire, while they are both held at an angle.