Chute cover, roller and/or scraper wire installation
For chute cover installation: Remove bottom
floor by removing 6 small screws. Remove small shaker wire from underneath
distribution slide. Move slide out of the way. Slip chute cover over chute
opening by slipping slotted edges of chute cover into frame of housing chute
opening, pushing evenly until it stops. Move slide back into place next to
roller. Re-install shaker wire underneath slide by slipping looped end into
small hole in center bulkhead first and flexing it to slip other end into small
hole located inside outer housing wall. Re-install bottom floor while holding
housing upside-down and install 6 small retaining screws - do not over-tighten.
For scraper wire installation: Remove bottom
floor by removing 6 small screws. Remove large white plastic gear from inside
roller. Lift up center bulkhead about a half inch. Slip one end of scraper
wire into small hole located inside the outer wall of housing. While flexing
other end next to center bulkhead, slip it into small hole in center bulkhead.
Push bulkhead down in place and push on side of bulkhead to make sure wire is
firmly in place. Re-install large plastic gear into roller by slowly spinning
and pushing on gear until all the way in. Move slide back into place next to
roller. Re-install shaker wire underneath slide by slipping looped end into
small hole in center bulkhead first and flexing it to slip other end into small
hole located inside outer housing wall. Re-install bottom floor while holding
housing upside-down and install 6 small retaining screws - do not over-tighten.
For roller installation, you will follow the same procedure
as the scraper wire installation, except that you will install the roller at the
same time as you do the scraper wire, while they are both held at an angle.
|